Tiangang Reservoir

Data & Statistics · Engineering · Tiangang Reservoir

Tiangang Reservoir sits immediately downstream of Shimantan Reservoir and failed in turn after Shimantan breached on August 8, 1975. Reconstruction was decided in 1997 and completed in December 2002. The figures below are extracted directly from the original source’s stated specifications. Source: 《舞钢市武功乡志》(Wugang City Wugong Township Gazetteer), pp. 109–111.

Engineering specifications (1958 original vs. 2002 reconstruction)

Parameter 1958 original 2002 reconstruction
Dam type Homogeneous earth dam Homogeneous earth dam
Main dam length 330 m 305 m
Auxiliary dam length 450 m 1,435 m
Main dam max height 16.5 m 19.1 m
Dam crest elevation 90.5 m not stated
Total reservoir capacity not stated (source separately gives a design-level capacity of 24.2M m³ and a check-level capacity of 6.5M m³; the relationship between the two is unclear from the text alone) 31.76M m³
Flood-control design standard 1-in-100-year design, 1-in-500-year check 1-in-50-year design, 1-in-1000-year check
Spillway max discharge 780 m³/s 4,020 m³/s
Controlled catchment area 75 km² 305 km²
Design irrigation area 112,000 mu not stated
Total investment not stated 43M yuan (central government 14M, Henan province 14.5M, Pingdingshan municipality 4M, Wugang city 10.5M)
Key dates Started Jan 1958, completed April 1958 Reconstruction decided Feb 16, 1997; completed Dec 2002

Figures are taken directly from the source as stated, without independent verification or unit conversion by this project. The large discrepancy in controlled catchment area between the two periods (75 km² vs. 305 km²) may reflect a redefinition of the catchment boundary rather than a physical change, but this hasn’t been confirmed.